The Umetel Engineering is involved with the supply of equipment for the construction, the expansion and redevelopment of Station Wastewater Treatment of Liverpool, through its local partner to Formwork Direct International.
The contract which involved the younger branch of Metalusa, it is one of the major works in Liverpool with an estimated cost of 200 million pounds, the equivalent of about 250 million euros, with an expected duration of 12 months, with finalization expected in mid-2013.