Follow the latest projects, developments and news from the METALUSA universe.
CHALLENGE Execution of slab. SOLUTION UPFORM horizontal formwork tables New METALUSA horizontal formwork system allows you to achieve greater […]
CHALLENGE Need to make Formwork from a reinforced concrete visor that is at a high height from the ground. It […]
CHALLENGE Preservation of the façade, taking into account the total demolition of the interior. SOLUTION The walls of the […]
CHALLENGE Maintain the total security of the facade taking into account that it is an old building and also maintain […]
CHALLENGE Compatibility of the radius of curvature of the wall with our Circular formwork system. SOLUTION The Engineering Department […]
CHALLENGE – Highness of the building. – The scaffolding was 200 feet high. SOLUTION The Nor48 ® scaffolding is […]
CHALLENGE – The main challenge pertains to the sharp inclination of the roofs and the need to adjust and make […]
CHALLENGE – The adaptation of the structure to the building’s geometry; – The assembly of the structure required thorough calculations […]
CHALLENGE – Adaptation of the structure to the building’s geometry; –The normal use of the building while the work was […]