CHALLENGE
– Concreting at high loads, executing the work in a short period of time.
SOLUTION
The construction of these new commercial premises in Lavra, Matosinhos was subject to strict specifications within a highly demanding time frame.
The primary objective was to build a robust structure to serve as commercial premises and the Forteko® vertical formwork system was chosen to execute the work.
The Forteko® vertical formwork system ensures high levels of versatility and is the most suitable system for this type of work.
The Forteko® system was used for the walls, panels, beams and pillars.
All the panels were combined in the vertical and horizontal position, with no limitations and allowing for concreting of up 90 Kn/m² pursuant to the conditions of standard DIN 18218.